Module 2 Resources
This case study provides three examples of ways in which an organization could identify a hazard, conduct a risk assessment and document the process including the selected risk control strategy or corrective action and the accompanying follow up. It looks at the selected hazard from the perspective of two separate organizations; a small Approved Maintenance Organization (AMO) and a small Flight Training Unit (FTU). Two of the formats are simple and the third is a full “Type 2A Risk Assessment Process”
Although this case study has a maintenance focus, the concepts and principles are applicable to any other type of aviation operation.